India allocates 480 MW renewables-plus-storage at $0.068/kWh
![energy storage systems energy storage systems](https://www.ess-news.com/wp-content/uploads/2024/05/powertitan_c_by_sungrow-jpg-webp.webp)
Solar Energy Corp of India has allocated 480 MW under its 1.5 GW renewables-plus-storage tender, at an average price of $0.068/kWh.
Hero Future Energies bid for 120 MW and won the capacity by quoting the lowest tariff of INR 5.59 ($0.067)/kWh. JSW Energy secured 180 MW, Serentica Renewables 100 MW and ReNew 80 MW at INR 5.6/kWh each.
The winning developers will set up renewable energy projects backed with energy storage system to supply firm and dispatchable renewable energy in a demand-following manner. The projects can be located anywhere in India and must connect to the interstate transmission grid.
The projects are to be developed on a build-own-operate (BOO) basis.
SECI will sign a 25-year power purchase agreement (PPA) with the successful bidders. Power procured by SECI from these projects has been provisioned to be sold to Punjab State Power Corp. Ltd and Madhya Pradesh Power Management Co. Ltd.
More about
Written by
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.
Comments Cancel reply
Popular Posts
![Container with battery energy storage systems is placed on a trailer Container with battery energy storage systems is placed on a trailer](https://www.ess-news.com/wp-content/uploads/2024/06/lithion-markets-materialhanding.jpg)
![Fire fighter extinguishing fire Fire fighter extinguishing fire](https://www.ess-news.com/wp-content/uploads/2024/05/firefighters-115800_1280-1200x803-1-jpg-webp.webp)
![Simulation for one autumn day Chart showing the simulation for one autumn day](https://www.ess-news.com/wp-content/uploads/2024/06/simulation-for-onen-autumn-day-1024x580.jpg)
Get the latest news about energy storage in your inbox
Related articles
![Batteries and PV modules Batteries and PV modules](https://www.ess-news.com/wp-content/uploads/2024/04/Galp_Powin_image_1-1200x675-1-jpg-260x146.webp)
![Large battery storage field Large battery storage field](https://www.ess-news.com/wp-content/uploads/2024/04/thumbnail_Plant_QP_30_blk_R01-1536x864-1-600x338-1-jpg-260x146.webp)
![Screenshot suena Autopilot Screenshot suena Autopilot](https://www.ess-news.com/wp-content/uploads/2024/05/suena_Autopilot_software-1200-260x146.png)