Grid-scale
Advertisement
Advertisement
Advertisement
Latest News
Advertisement
Construction of Spain’s first grid booster batteries to begin in January
Grid operator Red Eléctrica de España (REE) will install two 25 MW/18.75 MWh batteries in what it has described as 'the largest SATA [storage as a transmission asset] system in the south of the European Union and the first of its kind to be built in Spain.'
Long duration energy storage must scale 50x faster to reach net zero
Long-duration energy storage (LDES) capacity should reach 1.5 TW by 2030 and up to 8 TW by 2040 to achieve global decarbonization targets, says the LDES Council. Its annual report contains ‘seven enablers’ to scale LDES, mostly hinging on awareness of the technology.
All Grid-scale news
Construction of Spain’s first grid booster batteries to begin in January
Grid operator Red Eléctrica de España (REE) will install two 25 MW/18.75 MWh batteries in what it has described as 'the largest SATA [storage as a transmission asset] system in the south of the European Union and the first of its kind to be built in Spain.'
Advertisement
Long duration energy storage must scale 50x faster to reach net zero
Long-duration energy storage (LDES) capacity should reach 1.5 TW by 2030 and up to 8 TW by 2040 to achieve global decarbonization targets, says the LDES Council. Its annual report contains ‘seven enablers’ to scale LDES, mostly hinging on awareness of the technology.
Advertisement
Three UK BESS assets secure ten-year voltage contracts
Trio of storage projects in England selected to provide voltage services through tender process. Increased low carbon energy generation and a drop in minimum demand on Great Britain’s grid is driving need to find new ways of managing reactive power, according to system operator.
U.S.: Aypa secures financing for 1 GWh Arizona battery, Averon activates 600 MWh Tesla battery
Aypa Power has secured $398 million for its 250 MW/1 GWh Pediment battery energy storage system (BESS) and the first phase of Arevon's 758 MWdc solar and 300 MW/1.2 GWh Tesla Megapack BESS project is operational.
Advertisement